Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nice/domains/nicedevelopers-w205.accept.burovoordeboeg.dev/public_html/wp/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nice/domains/nicedevelopers-w205.accept.burovoordeboeg.dev/public_html/wp/wp-includes/functions.php on line 6131
SAWA mock-up - NICE Developers
Notice: Function WP_Scripts::add was wrong called. The script with the handle "wp-edit-post" has been queued with dependencies that are not registered: postbox. Read Debugging in WordPress For more information. (This message was added in version 6.9.1.) in /home/nice/domains/nicedevelopers-w205.accept.burovoordeboeg.dev/public_html/wp/wp-includes/functions.php online 6131
Logo NICE Developers

SAWA Mock-up

November 04, 2022

This week, construction began on the SAWA mock-up: a test setup of the wooden SAWA structure. Various measurements will be conducted using this mock-up in the coming period to further optimize SAWA's technical design.

All connections and technical nodes that will be implemented in the building will be tested here for assembly speed and feasibility, among other things. Additionally, various measurements regarding airtightness, vibrations, and sound, for example, will be conducted in the near future.
What is the sound spectrum of a vibrating washing machine, and what is the most optimal detailed design to ensure that vibrations do not propagate throughout the building?

These and other aspects will be tested in the SAWA mock-up in the coming period. The structural shell is currently being erected next to the SAWA construction site, and the mock-up will be further completed in the coming weeks.

The drawings for the mock-up were created by ERA Contour; the mock-up is being realized by ERA Contour andDerix Group.

Share on:

SAWA
Work in progress

Let's connect?

Are you curious about our solution to your challenge? Don't hesitate to contact us. At our own cafe, NICE Place, we'll gladly serve you a cup of coffee, a fresh beer, and discuss our progressive approach. Email info@nicedevelopers.nl to schedule an appointment.

Contact

NICE Concept

Read and learn more about our unique NICE concept. It is more sustainable, circular, flexible, and... certified! Prepare for greater impact.

Read more